The owner must understand the rough room inspection standards and precautions

<

Rough room inspection room can be said to be a major event in life, which is why many owners are willing to spend high prices to inspect the house master when they are inspecting the house. If the inspection room is not well tested, it will bring a lot of trouble to the life after the stay, making life difficult to secure, so the owners must be fully prepared before the inspection, careful inspection, leaving no dead ends. The following small series introduces the standards and precautions for the inspection of rough rooms.

First, the blank room inspection standards

1. All exterior finishes, including balconies and rain covers, shall be completed according to design documents.

2. Common parts, public facilities, all kinds of pipelines (give, row, rainwater, warm, heat), electrical equipment (distribution boxes, cabinets, plates, sockets, switches, lamps and lanterns), etc. shall all be completed according to design documents. And according to the provisions of the completion of various test items.

3, a variety of pipelines should be carried through the water, pressure test, pass the ball test and commissioning of heating and thermal acceptance.

4. The roofing project will carry out water storage and watering tests.

5. Where prefabricated floor slabs or cast-in-place roofs are used in each room within the door, it shall be done without plaster and leveled with putty to achieve dense and no cracks on the board seams, and shall be smooth and error-free. The surface shall be smooth and the color shall be substantially uniform. The straight line angle is straight; the concrete on the ground floor of each room within the door should be flat and compacted to achieve firm bonding and no cracks.

6, the room with waterproof requirements should be strictly in accordance with the waterproof layer, protective layer of the building requirements to plan, in the acceptance should be carried out two impoundment test, so that no leakage.

7. The floor drain and the flooding slope meet the design requirements, so as not to pour water, the joint is smooth and smooth, and there is no leakage.

8, the elevation of various floors of cement concrete ground floor, should consider the height requirements for re-decoration.

Second, rough house inspection inspection acceptance matters

1. If on the top floor, see if the roof leaks through the water;

2. Whether the switch master switch and the leakage protector are complete; whether the official power is connected or not, some are zero hours; if some local outlets, all try whether it is installed correctly and available (there are special socket circuit inspection instruments) With electric pen, socket circuit test equipment to go.

3, water. If tap water, hot water, and reclaimed water (if any) are connected, the water pressure is not enough; the piping leaks; the temperature of the hot water is not enough; all switches are available; closed water test, water meter idling test.

4, heating (pay later to pay this year, that is, winter re-delivery), gas. Whether it is switched on, the reading base of the watch should be zero. Radiator is complete, rough room should generally be with.

5, check the security door, whether scratches, whether the deformation of the door, the seal of the door and the box is tight, the door and the lock switch should be flexible.

6, the key to the door, a total of a few? Is it easy to use (all keys try to open and close). Whether the door is damaged, warped, and the switch is flexible. Is the cat's eye available? Find out, do a good job.

7, property fees can be paid, but to indicate the deadline. Renovation deposits and other decoration will be handed in again. Electricity charges, based on meter readings, are only due after the delivery date.

8. Measure the wall ground: Use a long ruler (or a special ruler with a level), and rely on the wall surface to check if it is flat. Also observe whether there is a scratch crack and whether the wall surface has a point of explosion. When the lime is not evenly distributed due to stirring, it will form a burst point when it is dry on the wall.)

9, anti-theft intercom, visual system, is intact, available (also try);

10、Whether broadband and telephone lines are available, available (preferably try), with a telephone;

11. Whether the windows are tight and there is no water leakage, the window sill should be 3-5mm higher than the outside (or it will flow back in); if the opening is flexible, the switch is intact and available;

12, bathroom, view the corresponding location directly below the building to see if the wash basin sewer pipe S bend (to prevent odor on the string), if not, in the decoration construction should pay attention to do a good job. Windows in the corridor should be equipped with anti-theft nets; if there are no windows, ventilation holes should be provided, and ventilation holes should be provided below the ceiling. The closest outlet from the vent is a waterproof socket;

13. The sooner you make your house, the better. You can make late delivery or delay. There may be other problems exposed because of delays over time.

Editor's summary: The standards and precautions for inspection of rough room inspections are introduced here, and we hope to help everyone. If you want to know more related information, you can pay attention to this website information.

Inspection room

Biometrics Recognition

Biometrics Recognition,Biometric Device Face Recognition,Biometric Facial Recognition,Biometric Facial Recognition System

ChangChun E-vida Technology Co.,ltd , https://www.evidatec.com