Renovation of Hydroelectricity Rehabilitation Construction Technology

<

With more and more decoration caterpillars, hydropower conversion of these hidden projects are increasingly being valued by the owners, because it is a hidden project, if there are problems after the transformation of hydropower, it will cause great losses, whether it is to find a decoration company or decoration team To carry out hydropower conversion, the owners need to strictly control in all aspects. If there is a problem after the house has been renovated, it will take a lot of time to repair it and cause a lot of inconvenience to the home life. Therefore, when the homeowners are doing home appliance projects, they must pay special attention to hydropower conversion and supervise the construction of the workers. What are the precautions for hydropower modification ? The following will tell you about the hydropower conversion construction process and precautions.

Hydroelectric conversion construction technology

Hydropower preparations

The hydropower design is based on the basic maturity of the renovation program. The following preparations must be made before the hydropower reform design:

1, do a good job in the space between the various functions, layout of the plane furniture, decorative decorative layout layout of a strong ceiling. For example: the placement and size of equipment such as beds, wardrobes, computer tables, the size and placement of dining tables in restaurants, the audiovisual effects required for audiovisual rooms, and so on.

2, personal preferences of a variety of kitchen appliances, equipment model size knows. For example, the overall design of the kitchen (completed by the kitchen cabinet designer) is directly related to the determination of the kitchen hydropower project; there are many options for the water heater, gas, electricity (also thermal storage type), solar energy, boiler heating There are many kinds of water and 24-hour residential water heater systems.

As mentioned above, before and after hydropower design needs to have a general idea of ​​the effect of home decoration. Many people know what they want but don’t know how to achieve this effect. Those who do not understand can transfer this work to the designers of hydropower. General 1-2 days in advance to make a reservation for the designer’s on-site service, the site can communicate fully. The purpose is to solve a means to achieve the desired effect. On this basis, professional designers will also put forward more rational suggestions on the site for the owner's reference. The owner only needs to have the final decision power and have selective opinions. The results will certainly be good.

Hydroelectric conversion construction process:

Circuit design should be multiplexed to achieve air-conditioning, kitchen, bathroom, living room, bedroom, computers and high-power electrical shunt wiring; socket, switch separate, in addition to general lighting, wall air conditioning should be independent of the use of leakage protection devices; Strong and weak separation, audio, telephone, multimedia, broadband networks and other weak circuit design should be reasonably regulated.

1. Before the wall and floor are opened, the cartridges are used for positioning. The surface of the pipe and the wall should be left with 15mm layer of dust to prevent cracking of the wall.

2. Do not arbitrarily destroy or change public electrical facilities, such as lightning protection grounds or protective grounding, without permission.

3, when the power line pipe buried, should be considered with the weak current line to maintain a distance of more than 500mm, the parallel distance between the electric pipe and the hot water pipe, gas pipe is not less than 300mm.

4, the wall line tube to reduce the turn as much as possible, and to avoid the installation of wall mirrors, furniture and other objects, to prevent damage by the hammer, nails.

5. If there is no special requirement, in the same suite, the switch is between 1200-1500mm from the ground, 150-200mm from the door, the socket is about 300mm from the ground, and the socket switches are all on the same horizontal line, the height difference is less than 8mm, and the parallel installation When the height difference is less than 1mm, it is not blocked by sliding doors, furniture, etc.

6, all kinds of strong and weak electrical socket interface Ning do not lack, on both sides of the bed should set the power outlet and a telephone socket, near the computer desk, living room TV cabinet wall should be set more than three power outlets, and set the corresponding TV, telephone, multimedia, broadband, and other outlets.

7. The method and requirements for laying weak circuits such as audio, television, telephone, multimedia and broadband networks are the same as those for laying power cables. The sockets or boxes are installed alongside the power sockets. However, it is not allowed to share a sleeve for strong and weak circuits. .

8. All the wall-in wires shall be embedded with PVC flame-retardant tubes of 16 or more, and the wires shall occupy <40% of the space of the tubes, and use special interface parts for connection with the bottom of the box.

9. When using the conduit, the power line pipe should pass through the ground to make a reasonable turning radius. Special attention should be paid to the use of the casing and glue connection under the ground. Before the ground is closed, the PVC pipe sleeve must be protected. There is a breakage damage; the PVC casing should be completely covered with cement mortar when laying floor tiles.

Hydropower Modification Notes

If a worker wants to do good, he must first sharpen his tools. The family is comfortable to live in, and the owner of the family has the most say. The preparation for hydropower reform is one of the basic preparations for the renovation. It is directly related to the degree of comfort and safety performance in the future. Most of the surface of hydropower projects after the completion of the decoration project are invisible and inaccessible. Once the major hidden losses are relatively large, they will often be more destructive. First of all, from the perspective of design thinking, it is necessary to grasp the principle of putting equal emphasis on safety and comfort, so that it can be targeted and avoid late loss.

1. Use of hydropower: In the home improvement process, hydropower projects account for a large proportion of the renovation budget, which is generally around 20%. So avoiding impractical alignment can save a lot of money!

2. The correctness of the positioning of hydropower: Minimize the distance between the alignment of hydropower and reduce unnecessary waste. At the same time, bending should be minimized. When the length of the straight line of the line exceeds 20m or the right angle bend exceeds three, additional middle should be added. Junction Box. Guaranteed overhaul.

3. The stability of water and electricity: In the decoration, the circuit traces need to be protected by PVC pipe. There should be sufficient distance between strong and weak electricity to avoid affecting weak signals. The indoor wiring of TV, telephone and network cable must not be connected in series. This also prevents signal interference. This is very important, otherwise there will be problems in the future!

4. The safety of hydropower: For example, in the water supply pipeline to suppress the experiment, the drainage pipeline to do the drainage test leakage! This must be done. Don't take too much trouble.

5. Finally, you will also leave a picture of the "water circuit's alignment or real scenery." In order to prevent it from being destroyed, it is used as a reference for repair.

Editor's summary: The above is related information on the hydropower conversion construction process and precautions. It is for reference only and hopefully helps everyone. If you want to know more related information, you can pay attention to this website information.

Hydropower installation hydropower reform

Stellite Viscose Staple Rayon Fiber Cutter Blade

 

The Viscose Staple Rayon Fiber Cutter Blade is one of Cobalt Alloy (stellite alloy ) but it has Special chemical composition, it is widely used in textile industry , we have control the core technology to produce this kind of cutter blade through Powder Metallurgy . Its main advantages are corrosion resistance and wear resistance better than other material. We have loyal customers from domestic and abroad now and can provide different specifications blade for customers upon their request.

 

Our company has been focused on researching and developing the cobalt alloy for more than 20 years, most of our products are made through powder metallurgy, so we can produce high quality cutter blade with powder metallurgy and also control the cost to give best price to our customer and help them to save cost. 

Cobalt Chrome Alloy Fiberglass Cutter Blade

Fiberglass Cutter Blade,Viscose Fiber Cobalt Chrome Alloy,Cobalt Chrome Alloy Cutter Blade,Viscose Fiber Cutter Blade

Shenyang New Industry Co.,LTD , https://www.topcobalt.com