How to install the screen stripe

<

The screens in the decoration are one of the indispensable items in the house. Since everyone will always open the windows for ventilation, the windows will need to be blocked and the screens will prevent the entry of mosquitoes, so the screens are the items that every family needs. , The following Xiao Bian will introduce how to install the screen under the layering and how to change the screen.

First, how to install screen layering

1. Assemble the square frame and place the yarn box on the top. Two wind slots are placed on the left and right sides of the lower end of the yarn box. The bottom of the pad rests on the bottom and forms a square frame. After that, use 6 screws, 2 screws are placed in different positions in the yarn box and 2 wind slots, and 4 different ones are placed in the 2 wind slots and the bottom of the bottom. Use these 6 screws to fix this. After the box, you can implement the next step.

2. Choose the place where the screens are placed, and then you can place the screens in the position where the device is needed. It must be noted that the yarn box is at right angles to the horizontal plane. The two wind slots should be placed in the middle, and at the same time, ensure that the distance from the window frame is the same, so that both sides are symmetrical. The bottom of the pad should not be placed directly on the top of the window frame, but should be placed lower than the window. Then use the clip to fix it.

3. Use electric drills to drill holes and secure the screws to secure the stealth screens. Drill holes in the two wind grooves and the bottom of the pad. When using electric drills, the 3.2mm bit is most suitable. To play a few holes according to their needs, playing 6 to 14 is enough. Finally, in the area where the hole is punched, the screws on the device are matched so that it is completed.

Second, how to install screen layering - how to change the screen

1. First, remove the original screen and use professional tools to pick up the layers of the old screen.

2. Pick up the old screen strips to be replaced.

3, replacement screens generally will be the entire layer together with all new, while a package of layers more than replace a window.

4. Neatly align the edges of the new gauze and the inside edges of the window frame, while maintaining ample position of the batten.

5. Use the special tools for screens to press all the beads into the frame.

6, touch the corner of the situation with a screwdriver to press firmly, relatively simple.

7. When securing the third and fourth sides, it is necessary to tension the gauze while the other side presses the nip, and then cut the remaining batten.

8. Use the lowest end of a screwdriver to press firmly, follow the perimeter of the window frame, and use the utility knife to finish the remaining gauze scissors.

Summary: The above is a small series about how to install the screen layering and how to change the screen full of content, I hope you can help everyone, I believe we look after the screen layering how to install a more in-depth understanding, if you need to know more For related knowledge, please continue to pay attention to this site.

How to install the screen layering

Mason`S Mate

Power Lift Joint,Magnetic Welding Holder,Mason`S Mate,Motor Mower Starter

SHAOXING SUNWAY TOOLS & HARDWARE IMPORT & EXPORT CO.,LTD , https://www.sunwaytools.com