House decoration acceptance notices six major considerations for acceptance of housing

<

It is a good thing to get a new house. After the owner has got a new house, it is best not to sign the decoration immediately. Before the owner signs the decoration of the house, he or she still needs to check and accept the house first. Then what are the notices for house decoration acceptance ? Next, Xiaobian will briefly introduce the housing decoration acceptance notice .

House decoration acceptance considerations

1, acceptance of the wall ground

When we check the walls, we can use a small hammer to gently tap the wall so that we can check if there is empty drum on the wall. Then use a special ruler to level the wall. We must also carefully observe the wall for cracks and other issues. As to whether or not the wall will seep, we can inspect the walls of the house on the second day after the heavy rain. If water seepage occurs, we can easily see it. If there are problems with the wall, we can use chalk to mark the walls. For ground acceptance, we mainly level the ground. If the ground difference is about 2cm, it is normal.

2, acceptance waterproof

We mainly inspect the kitchen and toilet waterproofing works. Unless the developer declares in advance that it is not waterproof, we all need to conduct a waterproof test first. We can make a threshold at the kitchen door and block the drain, and then put it about 2cm. The water, after 24 hours, we can go downstairs to the owner's house to see if the kitchen ceiling is seepage.

3, acceptance pipeline

The method of acceptance of the pipeline is relatively simple. We can fill a pot of water and pour it into the drainage pipeline or the sewage pipeline. This is to prevent the cement, etc. from remaining in the pipeline and causing drainage difficulties.

4, acceptance of doors and windows

When we accept the doors and windows, we need to check whether the doors and windows are firmly installed, there are scratches, missing parts, etc., whether its sealing strips are in good condition, and there is a level difference between the inside and outside of the balcony doors.

5、 Acceptance water voltage

When we accept the house, we also need to check the voltage, water pressure, etc. We can ask the professional to check to prevent the situation of water flow in the future.

6, acceptance of housing information

When we check houses, we also need to check whether the housing information is consistent with the contract. For example, if the actual area of ​​the house is used, whether the orientation and the public area are the same, and the general house is about 2.65 meters high. Acceptance of the housing needs to check the housing information, such as whether the housing quality assurance certificate and completion acceptance form are complete.

Xiao Bian concludes: With regard to housing decoration acceptance notice, Xiao Bian has introduced it here. I hope that after reading this article, I can provide you with reference and help.

House decoration acceptance considerations

Pu Resin For Wet-Process

Pu Resin For Wet-Process,Pu Leather Raw Chemical,Pu For Artificial Leather Skin,Polyurethane For Synthetic Leather

XUCHUAN CHEMICAL(SUZHOU) CO., LTD , https://www.xuchuanchem.com