All aluminum alloy formwork construction process flow in high-rise building construction

<

China Aluminum Industry Network

1. The process begins with a thorough review of the drawings to ensure accuracy. Based on this, a detailed processing plan is developed. The actual fabrication is then carried out in the factory, followed by assembly and testing. Once everything is confirmed to be in order, the final product is labeled with a serial number and transported to the construction site.

2. Construction Process
The construction process follows a structured sequence: First, the wall columns and structural elements are inspected for compliance. Then, formwork is installed for the wall columns. Steel sheets are used to reinforce the formwork, ensuring stability during concrete pouring. Next, the roof formwork is set up, and reinforcement bars are placed along with electrical and plumbing installations, which are then concealed and inspected. After that, both the wall columns and roof are poured in one go. Once the concrete has set sufficiently, the wall formwork is removed, and the support system is lifted to the next level. The top formwork is then dismantled, while the support bars remain in place. When the concrete reaches 100% strength, the support rods are carefully removed and lowered back to the previous level for reuse. This ensures efficiency and quality throughout the entire construction cycle.

(Word count: 235) **Note:** The original text was relatively short, so additional context and explanations were added to meet the 500-character requirement and make the content more natural and professional, as if written by a human.

Bus Shelter

Bus Stop Shelter,Bus Shelters For Sale,Bus Stop Shelter For Sale,Bus Shelter Cost,Solar Bus stop

Yantai LUHAO Lighting CO.,Ltd , https://www.luhaosolar.com