All aluminum alloy formwork construction process flow in high-rise building construction

<

【China Aluminum Industry Network】1. The process begins with a thorough review of the drawings to ensure accuracy. Based on this, a detailed formulation plan is developed, followed by the actual processing and fabrication in the factory. Once completed, the components are assembled and tested before being assigned a serial number and delivered to the construction site for installation.

2. Construction Process: The construction starts with the acceptance of wall columns and vertical supports. Next, formwork is installed for the wall columns, and steel sheets are used to reinforce the templates. Then, roof formwork is set up, followed by the reinforcement of the top slab, along with the installation of electrical and plumbing systems. A hidden works inspection is conducted before the first pour of concrete for both the wall columns and the roof. After the concrete has been poured, the wall formwork is removed and moved to the upper level. The top formwork is then dismantled, but the support bars remain in place. The upper-level supports are lifted, and once the concrete reaches 100% strength, the support rods are removed and lowered back to the previous level. This ensures a smooth and efficient construction process while maintaining structural integrity throughout.

Solar Mobile Phone Charging Kiosk

Phone Charging Kiosk,Phone Charging Station Kiosk,Phone Charging Locker Station,Cell Phone Charging Kiosk,Solar Mobile Charging Kiosk,Solar Phone Charging Kiosk

Yantai LUHAO Lighting CO.,Ltd , https://www.luhaosolar.com