1, the waterproof layer of the fortification height is not enough, and now the decoration is generally requested by the decoration company to do, the mason is not familiar with the waterproof, waterproof height of less than 30 cm around, bathing area can not meet the height of 1.8 meters waterproof, bathing area within 1.5 meters 1.8 meters high wall brush waterproof coating!

2. The partition walls are now made of light partition walls. The light partition wall is actually a gypsum board. It absorbs moisture, so it must be waterproof and moisture-proof.

3, the bathroom around the yin and yang corner treatment should pay attention to the leveling layer when the base surface to be flat, yin and yang angle processed into a smooth arc, because the wall structure and the floor structure is the easiest here due to drying shrinkage, structure Shen and other micro-slit displacement phenomenon caused by leakage of water.

4. The bathroom pipes are densely distributed. The roots of the small pipes must be sealed and protected. In the early stage of construction, the pipeline holes are reserved and are relatively large. After the structure is built, the upper and lower water pipeline facilities are installed and then manually sealed. Such secondary sealing is mostly insufficient and original. The combination of structures cannot achieve the integrity of the whole. It is easy to cause and leak water around the pipe, this phenomenon is a common problem of bathroom leakage.

5, bathroom water treatment, mostly guerrillas and non-professional people work, because of the material and the conditions of the base surface are not familiar with, from the beginning of the selection on the neglect, a lot of waterproof material on the base surface is very high, the most commonly used Polyurethane waterproof coating, recognized as high-grade waterproof material. However, for most of them, one-sided only understands the difference between the high and low grades of the materials, but rarely notices the requirements of the construction base conditions. The probability of the water surface of the construction base must not exceed 9%, and the base surface must be flat and compact (with 2 Meter ruler measurement does not allow 5mm height drop). In the wet interface construction, the film cures easily to form two skin phenomenon. It causes great waste to the owner, and the construction quality waterproof function has not got the slightest guarantee.

6, the majority of owners of the degree of emphasis on water is not enough, and sometimes even do not realize the importance of bathroom waterproof, causing desperation to the guerrillas and non-professionals, ultimately in vain, rework and materials, only price selection materials and Construction workers, greedy for a small loss.

The above points are analyzed, if a waterproof bathroom does not do a good job, after the decoration will cause a difference in the neighborhood, affecting the harmonious relationship between the neighbors, trivial things. Renovate and renovate, ask people to remove the decorated tiles, the disassembly tool needs 200-300 yuan, 400-600 yuan to re-waterproof. Such as waterproof after 24 hours of closed water acceptance after buying tiles and cement sand need 800-1000 yuan. The fee is 300 yuan. In the course of the entire renovation process, 200-300 yuan will be required if one accidentally damages the embedded fittings. This down a bathroom renovation needs 1900 ~ 2500 yuan. It also takes about 10 days to delay your time.