Metering pump gap replacement steps introduced

<

When it comes to metering pumps, occasional failures and replacements are inevitable. There are several important details to consider during the process. Here's a step-by-step guide from Asian Fluid Network on how to replace the gap in a metering pump: 1. Begin by removing the four screws that secure the pump head. These screws are typically located on the opposite side of the dosing pump. 2. Once the pump head is removed, inspect the internal components for any signs of damage or wear. If everything looks good, install the new pump head and rotate the backplate and cover clockwise until they snap into place. Make sure the drain discharge hole is positioned at the bottom of the pump for proper drainage. 3. Gently pull the hydraulic end outward to access the screw inside the socket. Hold the liquid chamber and turn it counterclockwise. You may feel some resistance, but continue turning until the gap is loosened. 4. After adjusting the position of the hydraulic end with the backplate, tighten the four diagonal bolts gradually. Ensure even pressure is applied to all bolts to maintain stability and prevent misalignment. 5. Before removing the pump head, adjust the stroke length to 0%. This ensures that the electromagnetic mechanism has enough pressure to hold the assembly in place, allowing you to safely remove the gap without causing damage. 6. Next, set the stroke length back to 100%. This will allow the entire assembly to align properly with the backplate’s drain vent, which should be at the bottom of the pump. While the pump is running, make sure the hydraulic end and gap are positioned correctly for optimal performance. 7. Finally, install the pump head after the deflation device has been fully released and the backplate’s vent is in a vertical position. Confirm that the suction valve is aligned with the leak drain hole, and that the hydraulic end screw fits into the corresponding four holes. Always check the pump regularly during operation, and if any issues arise, address them immediately to avoid further complications. Regular maintenance and careful attention to detail are essential when working with metering pumps. By following these steps, you can ensure a smooth and safe replacement process.

Escalator Parts

Escalator Parts,Escalator Host Gearbox Tape,Escalator system,Elevator handrail

Suzhou FUJI Precision Elevator Co.,Ltd , https://www.profuji.com