Concrete seal curing agent floor construction do you understand the ground treatment

<

Construction of concrete sealant curing agent floor is believed to be difficult for many people to understand. Concrete floor curing agent must ensure that the concrete is completely dry before construction. Usually curing agent is applied after concrete is cured for about 20 days. The curing agent penetrates completely into the concrete and concrete, and the final product is also the original appearance of the concrete. However, at this time, the concrete has formed a solid overall, anti-infiltration, pressure, abrasion resistance, corrosion of acid and alkali salts, no ash, no maintenance and maintenance. Then, together with the Xiaobian, learn about the floor treatment of the concrete sealant curing agent.

First, the newly poured concrete floor

1, using at least C30 concrete pouring, so that the strength of the ground structure reached C25-30 or more.

2. Where the concrete is poured, if no waterproof film is installed, it should be sprinkled to keep the foundation wet.

3, the cement surface should be poured together with the concrete, and directly with the equipment pressure, can not be put on the light gray ash.

4. After the surface layer is finished, it needs to be dried and maintained for 28 days. The winter season can be shortened to 20 days. Sprinkling water curing time requires that the surface layer be kept moist for at least 14 days. When the sealant curing agent is applied on the floor, the moisture content of the sealant can be less than 8%.

Second, used old concrete floor

If the old concrete surface is not contaminated by oil, acid or alkali, etc., it can be constructed in accordance with the construction process steps of the sealant curing agent floor; if it has been contaminated with oil, acid-alkali corrosion or old paint used, must be thoroughly Remove all kinds of dirt, oil, paint, use a large grinding machine to thoroughly level the base, clean, so that the ground meets the construction requirements.

Third, terrazzo tiles and other types of ground

The ground floor is a terrazzo tiled floor. After strength grinding, roughing and vacuuming, Lida Epoxy Primer is used as a base layer epoxy process. Loose tiles must be knocked out and then filled with epoxy mortar. Smooth and smooth, then proceed to the next coating process.

Editor's summary: The treatment of the floor of the concrete sealant curing agent on the ground is introduced here, and I hope to help everyone. If you want to know more related information, you can pay attention to this website information.

Entrance floor ground floor wooden floor ground tile price table aisle floor parquet corridor ground floor

Kitchen Cut Board

A cutting board is a must-have item in the kitchen. Cutting vegetables, cutting fruits, etc. are all inseparable from a useful cutting board. Our cutting board is made of selected natural wood, moderately soft and hard, tough and thick; not easy to hurt the knife, not easy to deform, not easy to burst, easy to clean; simple in shape, beautiful and durable, it is a rare kitchen helper.

Kitchen Cut Board,Kitchen Cutting Board,Vegetable Cutter Board,Kitchen Chopping Boards

JIANGMEN MEIAO KITCHEN AND BATH CO.,LTD , https://www.meiaogroup.com