Product Name:Forge Clevis
Key words:Forge Clevis,Forge Ball Clevis Connecting,Power Forge Ball Clevis,Forge Ball Clevis For Galv
Application: Easily manipilate the state of our functional component without needing to convert them into class components.
Technical parameters
Description: Forge ball clevis for power
Size:1100x44
Part No.: Q.Q.Q.000296
Material elongation:40Cr
Finished: Galvanized,HDG,Plain,Painting,Dacromet,Electrogalvanizing,Oiled,Phosphorization,etc
Place of origina:China
HS Code:730820
Trademark:ZBRF
Color:Customized
Part:Power,Galv
Transport Package:Plastic Bag or Gunny bag and Wooden Case
Port of shipment:Shanghai Port,Taicang Port
Certification:CE,SGS,A.S
Hardness:225-275
Load≥70KN
Forge Clevis,Forge Ball Clevis Connecting,Power Forge Ball Clevis,Forge Ball Clevis For Galv TAICANG ZHONGBO RAILWAY FASTENING CO., LTD. , https://www.railfastener.com
Rebar processing machinery installation and transportation:
1. Before the transportation of machinery and equipment, the personnel responsible for the command must understand the weight of the machine to be transported, the vulnerable parts of the machinery, etc., remove the circuit and auxiliary equipment if necessary, lock the moving parts, remove the anchor bolts, and prepare for proper Tools and trim to pave the way.
Second, according to the structure of the equipment during the transportation, it is guaranteed to be tightly bound, not overrun, not overweight, securely centered, and reliable in braking to ensure safe driving.æ’¬, top, drag, pull, push and other operations to select the appropriate site to prevent damage to machinery.
Third, the use of rolling bar rolling machinery, should assign someone to replace the rolling bar, pushing and pulling staff and the replacement of the rolling bar must have contact signals to coordinate the action.
Fourth, the use of tractors or other mechanical traction must pay attention to the observation of obstacles surrounded by tractors are obstacles, once found to stop in time. Traction wire rope should be hung in the appropriate place, if necessary, under the wire rope should be lined with wood or other items to prevent damage to machinery. When hauling, all personnel should maintain a proper distance from the wire rope to avoid breaking the rope.
5. The machinery to be transported should pay attention to parking smoothly when parked, and it is generally forbidden to park on slopes. High equipment such as vertical drilling machines, slotting machines, presses, etc. shall not be moved, transported and parked. When you must lay down, you must set brackets and other measures.
Sixth, steel machinery equipment should be coated with oil before transport, installation base, if necessary, should produce packing boxes. When transporting cars and trains, they should be placed in the middle of the carriages so that the carriages are evenly distributed, covered with tarpaulin, and tied tightly to prevent them from moving.
Seventh, when the mechanical unloading is to be carried out gently, it is forbidden to throw away from the car.
VIII. No machinery shall be installed in soft areas, dangerous rock caves, slopes or places that may be affected by floods, flying rocks, or vehicles. In special circumstances, there should be reliable protective measures to ensure safety before installation.
9. The layout of the engine room should be constructed in accordance with the mechanical specifications and actual needs. The equipment room shall ensure mechanical windproof, rainproof, antifreeze and other requirements, the area shall be appropriate, and it shall be convenient for operation and maintenance. An appropriate channel shall be reserved. The distance of the manufacturing workshop shall not be less than 1.5m, and the width of the channel shall not be less than 2m. There should be sufficient lighting, good ventilation conditions, and necessary shutdown protection for temporary use of machinery.
Tenth, machinery and equipment are generally arranged obliquely to prevent workpieces, iron swarf, and tools flying out of wounds.
11. The technical requirements for the installation of machinery and equipment shall be based on the relevant provisions of the machinery manual. The base must be stable, and the horizontal and vertical levels must meet the requirements. The precision machine tools should have appropriate anti-shock facilities. After completion of installation, safety inspections and performance tests shall be carried out, and they shall be put into service after passing the test run.
Rebar processing machinery transportation and installation
What matters need to be noticed during the transportation and installation of rebar processing machinery? Luzhou Jintongcheng Machinery Co., Ltd. is a professional manufacturer engaged in the development, production, and sales of steel rebar processing machinery and steel rebar machinery. It will explain and introduce the transportation and installation of rebar processing machinery.